Posts under ‘4. Framing’

Framing Lower-Level Partitions

February 9th, 2010 by KTU | No Comments | Filed in 4. Framing

After the slab was poured, the guys framed the walls on the lower level. Like most framing, this happened in a snap, maybe two days for two guys. They lay out the walls with a chalk line and crayon on the slab and then frame up the walls.

Framing in progress on lower level. You can see how insulation is used in wall to left.


(more…)