Support Structure

January 22nd, 2010 by KTU | 2 Comments | Filed in 2. Site preparation

One of my goals for this project was to tread lightly on the land.

The high spot of the site was a boulder maybe 16 ft. x 8 ft. and protruding 8 ft. above grade at one end. I decided that a nice approach would be to set the structure on the boulder. I reasoned that the boulder probably extended several feet below ground and was probably not going to move much over my lifetime.

Here I laid out the structure with some 2×4s to figure out how to orient it relative to the boulder. The boulder is covered with moss and lots of wet organic stuff as is typical of this part of Vermont.

Laying out location of structure with 2x4s and clamps.

(more…)