Driveway

October 23rd, 2010 by KTU | Filed under 7. Landscaping and Hardscaping, Park City Mountain Modern.

Tyler and Danny (Waters Excavating) came back to clean up the front yard and prep for the concrete driveway to be placed. They are can-do guys and pretty much just figured it out and got it done in one long day. They were the first ones on the site back in April and now one of the last on the site in October. Tyler has a bunch of big track hoes, but does a lot of his work with this small Komatsu hoe. It’s really nice and comes equipped with a rubber track so it doesn’t ruin the asphalt as they run around. I’d love to have one of these, but at $55,000 a pop, this is probably one tool I won’t own.

Tyler prepping the front yard for the driveway and sidewalk.

The driveway area ready for concrete.

After the gas-line guys had made a mess of the driveway...but now with lines spray painted and inspection passed. Waiting for concrete.

Driveway poured and blanketed (Friday).

Sunday. Whoa. Finished with one day to spare.

Finished driveway with the forms and blankets removed. Very nice job by Gough Concrete. We're supposed to keep vehicles off for four weeks.