Posts Tagged ‘rough plumbing’

Foundation Installation

May 30th, 2010 by KTU | No Comments | Filed in 2. The Site, Excavation, and Foundation, Park City Mountain Modern

This week we got the foundation installed, the damp-proofing and insulation in place, the footing drains installed, and the sub-slab rough plumbing placed. We’re now ready for the lower-level slab to be poured (with the hydronic tubing for heat installed within the slab).

Here are the photos of the foundation and related steps.

Steel installed within forms.

There's a lot of steel rebar in a foundation. The first step is to tie the bar, using a power stapler-like tool.

(more…)

Tags: , , , ,