This project moved in three phases. First, we attacked the lower level. Then, we moved upstairs and took on the dining area, kitchen, and main-level bath. Finally, we moved upstairs to do the master bedroom “loft.” We lived in the house through the whole process, which is why we moved in phases. It actually wasn’t too bad. I sealed off each section with plastic (and even with a temporary door during the last phase).
